News

Novocherkassk Electrode Plant launches modernized baking furnace

Novocherkassk, June 7, 2018 – Novocherkassk Electrode Plant (part of the ENERGOPROM Group) has loaded the first batch of graphite electrodes into a new baking furnace. The modern heating unit is designed to produce electrodes with diameters of 610 mm, 650 mm, and 710 mm. The equipment was launched as part of an investment program aimed at reequipping production facilities with a focus on the production of large-size electrodes for electric arc furnaces.

The new baking furnace has a capacity of more than 1,000 tons per month. Efficient use of furnace chamber loading will make it possible to fire large diameter electrodes. As a result, capacity will increase by 25%.

As part of the program to reequipment production facilities in 2017–2018, the plant is reconstructing and repairing all existing baking furnaces, which will significantly improve the electrode production capacity and improve its quality.

Novocherkassk Electrode Plant launches modernized baking furnace
Evgeniy Churikov Appointed Managing Director of Novocherkassk Electrode Plant
The Chelyabinsk plants of ENERGOPROM Group present their environmental initiatives to regional experts
Acting Governor of Novosibirsk Region Andrei Travnikov Makes a Working Visit to Novosibirsk Electrode Plant
ENERGOPROM Group takes part in a discussion of prospects for development of the coal and graphite industry in Russia
ENERGOPROM Group and SOLVER signed an agreement for construction of the Nipple Center at Novocherkassk Electrode Plant
Chelyabinsk Branches of ENERGOPROM Have Created an Integrated Environmental Center
ENERGOPROM Group and EIRICH GMBH have executed a contract for continuous intensive Mixer for the Novosibirsk Electrode Plant
TMK and ENERGOPROM signed a long-term contract for graphite electrodes supply
ENERGOPROM and RIEDHAMMER GmbH started construction of a new furnace at Novocherkassk Electrode Plant
RUSAL and ENERGOPROM Entered Into a Long-Term Anode Block Supply Contract
Chelyabinsk Electrode Plant's Output Increased 40 % in 2017
RUSAL and ENERGOPROM Sign a Long-Term Contract for Supply of Graphite Products
The Quality Management System at the Chelyabinsk Electrode Plant Certified by International Auditors
ENERGOPROM Group Developed Conceptually New Product for Emirates Global Aluminium
ENERGOPROM Group Made General Agreement for Cooperation with 1C
ENERGOPROM Group announces the request for quotation to the lot of UHP and SHP graphitized electrodes
Announcement
ENERGOPROM Group started production of the UHP-610 graphite electrodes at the Novosibirsk Electrode Plant
Statement from energoprom group on the special safeguard investigation into graphitized electrodes
Energoprom Launches Facebook Account